ADVERTISEMENT FOR FORMAL BIDS
Posting Date February 6, 2025
Toppenish School District
Request for Formal Bid
The Toppenish School District is inviting qualified contractors to submit formal bids for the following project:
Project Title: Lighting Retrofit Project
Location: Kirkwood Elementary and Middle School
Scope of Work:
The project includes removal and replacement of light fixtures and lights. Full details of the scope of work, specifications, and requirements will be available in the official bid documents. Mandatory walk through is February 17, 2025, starting at 9:00am, main entrance at the middle school.
Bid Submission Requirements:
Bidders must submit a detailed proposal that includes:
- A cost breakdown (labor, materials, equipment, etc.)
- Project timeline
- Relevant qualifications and experience
- Required licenses and insurance documentation
- References from previous clients
Deadline for Submission:
Sealed bids must be received no later than February 27, 2025 at 12 noon. Late bids will not be
considered.
Submission Instructions:
Please submit your bid to Toppenish School District, 306 Bolin Drive, Toppenish, WA 98948. For additional information or to request a copy of the full bid documents, (also on our website, https://www.toppenish.wednet.edu/85528_3, please contact Mark Kresge at mkresge@toppenish.wednet.edu .
Compliance with Laws:
The awarded contractor will be required to comply with all applicable Washington State laws and regulations, including licensing, bonding, prevailing wage, and insurance requirements.
Other:
Construction hours are 2:30pm-11:00pm. Contractor is responsible for all permits. Work must be completed no later than June 30, 2025.
Contract Award:
The contract will be awarded to the lowest responsible bidder, meeting the specifications and requirements of the project. The school district reserves that right not to award certain areas of the bid.
Toppenish School District reserves the right to reject any and all bids.
-
.pdfMS BID FORM 1 10 25
-
.pdfE2.0 MS Site Fix sched 1 of 7
-
.pdfE2.1 MS 100 Bldg 2 of 7
-
.pdfE2.5 MS Gym Lighting 6 of 7
-
.pdfE2.6 MS Music Rm 7 of 7
-
.pdflighting retrofit formal bid
-
.pdfE2.3 MS 300 bldg 4 of 7
-
.pdfE2.4 MS Building 400 5 of 7
-
.pdfKirkwood Bid Form 1 10 25
-
.pdfE2.0 Lighting 1 of 5 Kirkwood 2024
-
.pdfE2.1 Lighting 2 of 5 Kirkwood 2024
-
.pdfE2.2 Lighting 3 of 5 Kirkwood 2024
-
.pdfE2.3 Lighting 4 of 5 Kirkwood 2024
-
.pdfE2.4 Lighting 5 of 5 Kirkwood 2024
-
.pdfE2.2 MS 200 bldg 3 of 7